DANNAR® 3.00 is an electric work vehicle and energy platform. Remote controlled, operator platform or cab – all with the safety of the operator in mind.
DANNAR 3.00 - Base Model Information
The DANNAR 3.00 base configuration comes standard with two 33 kWh BMW i3 Li-Ion battery packs (66 kWh total), and can be easily upgraded to four packs for a total of 132 kWh on-board electricity. The export panel is configurable with multiple 110VAC and 208VAC outlets. Built on a heavy-duty steel ladder frame, the DANNAR 3.00 can easily be equipped with an optional open operator cab platform equipped with a joystick, foot pedal and touchscreen tool control. Base model comes standard with a flat bed and universal quick attach mounting plates that can receive any standard CAT®, Bobcat® or John Deere® attachments. The DANNAR 3.00 can operate in up to four feet of water, carries Type I, II and III hydraulic tool circuits, and has four-wheel, multi-mode steering.
In the DANNAR 3.00 open platform configuration, it can accommodate additional BMW battery packs with up to 198 kWh of energy storage. An optional Cummins Tier IV generator can also provide 60 kW of continuous export power and battery recharging.
See the DANNAR Mobile Power Station 3.00 in action.
Check out the videos in our video library to see how DANNAR can meet all of your work needs.
DANNAR. Always Ready.
See how DANNAR is configurable daily, seasonally or in an emergency to meet your needs.
Have a question or need help?
We understand that you may have more questions. For us to fully respond, we’ll have a few questions ourselves. Such as, what is the work task you want to accomplish or your energy needs? When you’re ready, we’re here to listen. In the meantime, perhaps these videos and articles can show how others are utilizing the DANNAR.
Video Library
eNews
DANNAR Featured in Inside EVs Article: The Dannar MPS Is A 500 KWH Remote-Controlled Battery. And Everything Else You Could Imagine.
We’re honored to be featured in this article...
Clean Energy for Dirty Jobs | AFWERX
Clean Energy for Dirty Jobs – AFWERX Challenge #2! In July of 2020, DANNAR and our Mobile Power...
We're Powering Ahead
We look forward to assisting you with your funding needs.
Existing budgets do hold the keys to electrifying your fleet. There is more than one way to begin the process and continue the momentum you already have going. When designing the MPS we knew we needed to start with a clean sheet of paper to engineer a new solution for today's problems. It's the same with funding.
Start. Clean.
Contact
DD DANNAR, LLC 2220 E. Bunch Blvd, Muncie, IN 47303 and San Clemente, CA 765-216-7191